Mullen Trucking was awarded with a Generator Replacement project early in 2014. We moved approximately 65 loads in varying??sizes, with the ??largest weighing in at 139,000 lbs on a 13 axle trailer, from Vancouver, BC to Saskatoon, SK. Mullen Trucking delivered all loads on time and claim free, and wrapped up the project in November 2014. A great job to all involved in making this project a success.
More images of this project: