HIGHLIGHTS  >  FEATURED PROJECT

Awarded transportation of Pipe racks and buildings for a project on the North Slope of Alaska.

Project consists of approximately 50 loads. Aidrie Alberta to Port of Stewart BC for barge furtherance to North Slope of Alaska

Late 2023 through 2024

PAST PROJECTS

CNG – Sustainable Transportation Initiative December 6, 2021

(Aldersyde, Alberta, December 2021) Mullen Trucking Corp (‘Mullen Trucking”), a long-term provider of full-service transportation, warehousing and distribution is proud to announce the addition of a fleet of Compressed Natural Gas (CNG) powered Class 8 trucks as part of our sustainable transportation initiative. The addition of the 2022 Kenworth T680 trucks (www.greatwestkenworth.com) which are powered […]

CRAWLER CRANE MOVE February 18, 2020

Awarded Crawler Crane move from Fort McMurray Alberta to New Football Stadium build site in Las Vegas, Nevada. Timeframe for project: Summer 2019 Commodities : Crawler Crane Components Approximate Number of loads : 93

SYNTHETIC FUEL GAS PLANT BUILD February 12, 2020

Awarded Heavy Haul/Super load and Legal load items + Long term storage for a new Synthetic fuel plant build near Carseland Alberta Timeframe for project September 2018 to June 2020. Origin of loads : Sapulpa, Oklahoma. Calgary, Alberta. Seneca Falls, New York. Houston, Texas. Seattle, WA. Pittsburg California Destination: Carseland, Alberta Commodities : Air Exchangers, […]

PIPESTONE PROJECT – SOUR GAS PLANT BUILD February 4, 2020

Awarded Heavy Haul/Super load and Legal load items for a Sour Gas Plant Build. Timeframe for project November 2019 to March 2020. Origin of loads : Port of Houston /  Broken Arrow Oklahoma / New Kensington Pennsylvania / Norwood Ohio / Jonesboro AR. Destination: Grande Prairie, AB Commodities : Ducting / Inlets / Coolers Approximate […]

Process Unit and Vessel Transportation – Stewart, BC to Redwater, AB November 2, 2016

We worked extensively with the BC Ministry of Infrastructure and Transportation to receive approval for over-dimensional freight movement through the corridor from Stewart, BC on to the BC/Alberta border. On February 13, 2016, as a trial run, Mullen Trucking was on site at the Stewart World Port to receive cargo off the first ship to […]